Ground Engineering Solutions
 

Trench Control

Helping out with Trench Control’s bespoke pile installation equipment

We undertook a third party temporary works check on Trench Control’s bespoke excavator-mounted hydraulic piling gate, seen here in action at Montrose Port.

Basement raft poured at Exo Dublin

Basement raft poured at Exo Dublin. Temporary retained height (before the raft was poured) was in excess of 7m. Installation of sheet piles and framing system by Trench Control. Sheet piles will remain permanently – fully welded clutches also constructed by Trench Control. Exo Core 2 rising in the background.

< Back